Pre-Engineered

SKYSCRAPER gives solutions to a customer’s needs in Pre-engineered metal buildings. These buildings are flexible enough to suit different building dimensions; they are easily expandable, can withstand harsh climatic conditions, and come with maintenance-free exteriors. Pre-engineered buildings are suitable for both, industrial and commercial operations. PEB is a cost-effective building. SKYSCRAPER is specialized in designing, fabrication, and erection of pre-Engineering Buildings. We work on a Turnkey basis by following international standards. Pre-Engineered Metal Building Systems offer modern solutions to all building constructions along with the benefits of superior quality, efficiency, and durability. PEB is comprising of Built-up “I” shape primary structural framing members in columns and rafters. In cold-formed structure “Z” and “C” Shaped secondary framing member for Roof Purlins, Eave struts, and wall girts. Roll Formed sheeting for cladding.

  1. REDUCED CONSTRUCTION TIME
  2. LOWER COST
  3. ERECTION TIME IS FASTER
  4. FLEXIBILITY OF EXTENTION
  5. LARGE CLEAR SPANS
  6. QUALITY CONTROL IS EASY
  7. LOW MAINTENANCE &OPERATING COST
  8. ENERGY EFFICIENT ROOF AND WALL SYSTEMS
  9. ARCHITECTURAL VERSATILITY
  10. SINGLE SOURCE RESPONSIBILITY (Single Team Job)

REDUCED CONSTRUCTION TIME:
Due to the systems approach, the use of high strength steel, use of tapered built-up sections which are optimized by the computerized design program, and the use of continuous light gage secondary steel section, there is an overall reduction in steel weight, cost, and time relative to conventional steel construction. It can reduce total construction time on a project by at least 50%. This will allow faster occupancy and earlier realization of revenue.

DESIGN:

Since PEB’s are mainly formed of standard sections and connections, the design time is significantly reduced. Specialized computer analysis and design programs optimize material requires. Drafting also computerized using standard details that minimize project custom details. The low-weight flexible frames offer higher resistance to seismic forces.

LOWER COST:

Due to the systems approach, there is a significant saving in design, manufacturing, and site erection cost. The structural elements are shaped to follow the stress diagram of the member, thus reducing weight, cost, and load to foundations. The secondary members and cladding nest together reducing transportation cost. The overall price per square meter may be reduced as much as 30% lower than conventional steel.

FOUNDATIONS:

Pre-engineered Buildings are about 30% lighter than the conventional steel structures. Hence, the foundations are of simple design, easy to construct, and lighter weights.

ERECTION:

Since all the connections of the different components are standard, the erection time is faster.

FLEXIBILITY OF EXPANSION:

Buildings can be easily expanded in length by adding additional bays. Also, expansion in width and height is possible by pre-designing for future expansion.

LARGE CLEAR SPANS:

Buildings can be supplied to around 90M clear spans.

QUALITY CONTROL:

As buildings are manufactured completely in the factory under controlled conditions, the quality is assured.